20 May Construction signage on Main Road
The signage related to the construction on Main Road will remain in place throughout this 6-week project, including weekends.
Even though work may not occur during the weekend, Main Road, from Quarry Point to Bellevue, is still considered a construction zone, and the use of correct and adequate signage is strictly regulated by law.
Some residents may feel differently about the necessity for this signage, and indeed, some have taken it upon themselves to move these signs.
Moving the signs puts residents, the contractor, and the Town at risk, and will not be tolerated.