Pine Lake is controlled by a dam at its outlet. The dam is damaged and sagging and requires repair. Leakage under the dam is so abundant that the lake is completely empty.
As a result of this problem that occurred in the spring of 2014, the Town of Hudson mandated AMEC Environment & Infrastructure (now Amec Foster Wheeler) to conduct a hydrological study of the drainage basin of the Viviry Creek.