Roadworks on Harwood (342) from March 4th to 22nd, 2019

The section of Harwood between Bellevue and rue Acres will undergo work beginning Monday March 4th through to Friday March 22nd, from 6:30 am to 6:30 pm, resulting in lane closures. Signalers will be on site to control traffic flow. Work is planned to be done in small sections to reduce disruption. These roadworks are to build a feeder line connecting the Hudson Acres, Tree Farm and Ritchie developments to Vaudreuil-Dorion’s water system.
In the event of operational constraints or adverse weather conditions, this work could be postponed or extended.